Skip to main content
Logo icon
City of Westminster
Conservatives

Main navigation

  • Our Team
  • Our Plan
  • Local News
  • Local Issues
  • Have your say
  • Sign Up for Updates
  • Contact us
  • facebook
  • twitter
  • instagram
  • linkedin
  • youtube_channel
Logo icon
City of Westminster
Conservatives

Two-Way Baker Street - Ongoing Monitoring

  • Tweet
Monday, 9 December, 2019
  • Local News
Baker Street

The Council will be undertaking the final traffic surveys that form part of the post-implementation monitoring strategy. Results from these surveys will then be analysed alongside the other survey data that has been collated since the switch to two-way operation.

Altogether the commissioned survey-work consists of:

• Classified Turning Counts at 34 junctions to ascertain vehicle mix (York Street is included)

• Pedestrian Crossing Counts at 18 junctions to gauge crossing-demand (the George Street junctions with Baker Street and Gloucester Place are included, as are the two junctions with York Street)

• Pedestrian Link Counts, to identify the number of pedestrians using either one of the footways in 9 sections along Baker Street

• Automatic traffic counts at 20 locations to measure vehicle-speeds and numbers

• Journey-time surveys along 7 routes for both directions of travel. (These cover the major north-south and east-west routes in the area).

A comparison will be made with traffic-survey data that was collected before the works started in July 2017.

All construction, street-lighting and snagging works have now been completed.

Please raise any issues such as road maintenance, parking contravention or illegal vehicle movements, directly with the Council by clicking here.

Traffic signals: to report a problem with a traffic signal, please contact TfL here.

You may also be interested in

Barbara Arzymanow

Barbara Arzymanow

Councillor for Marylebone Ward
Barbara Arzymanow has lived in Westminster for over 35 years and knows how much difference a strong local voice can make. A Ward Councillor since 2014, she has worked with local people and organisations on issues associated with air-quality, public protection, public realm and planning.
Our Plan: Caring for the Vulnerable

Our plan to tackle homelessness in Westminster

Wednesday, 8 April, 2026
This week Westminster Conservatives have launched our plan to care for the vulnerable in Westminster. We spoke with the Conservative Leader of Westminster City Council, Cllr Paul Swaddle, to find out more.

Show only

  • Local News
  • Westminster News

Westminster City Council Conservatives

Footer

  • About RSS
  • Accessibility
  • Cookies
  • Privacy
  • Donate to our Campaign Fund
  • Our Conservative Team
  • Our Plan
Donate now
  • facebook
  • twitter
  • instagram
  • linkedin
  • youtube_channel
Promoted by James Cockram on behalf of Westminster Conservatives all at 90 Ebury Street, Westminster SW1W 9QD 020 7730 8181
Copyright 2026 City of Westminster Conservatives. All rights reserved.
Powered by Bluetree